Build log, real example
A real example: a lab run on live metrics
Kaizen without a baseline is an opinion. So the lab does what I asked of every plant I ran: it measures itself every day, in public, and the bad days stay on the board next to the good ones.
What the numbers mean
The board at kaizen-lab.io is fed by a small collector that reads the lab's own monitoring, not a spreadsheet I fill in. A few of the tiles:
- Uptime. Availability of the services the house depends on, over 30 days. One bad network day pulls it down for a month. That is the point: it is a lagging indicator you cannot fake.
- Backups. Consecutive days on which every backup job finished. When the jobs failed six days running, the streak went back to zero, and the red days are still there.
- Idea funnel. Improvements raised versus implemented. A kaizen system that only collects ideas is a suggestion box.
- Right first time and cost of poor quality. For the 3D printer: parts delivered on the first attempt, and scrap priced in pesos.
Two lessons, turned into numbers
Before the lab there was a plant floor. The bakery capacity calculator encodes two lessons from a bakery where I was plant manager.
One: more WIP in front of a bottleneck does not make it faster. The calculator starts from the order and explodes it backwards (boxes, pieces, trays, batter, drums) until every area has its hours. The slowest area sets the ship date, and Little's law caps the trolleys in rotation. Ninety trolleys parked in front of a cutter that handles seventy-five trays a day help nobody.
Two: FIFO is the cheapest quality system there is. Cooling trolleys have a window: at least 30 minutes, at most 24 hours. Push past the WIP cap and they queue in the cooling lane until they become scrap, and the calculator prices that scrap as cost of poor quality.
The calculator's default numbers are illustrative. They keep the structure of a real bakery, not anyone's data. Change any input; it all runs in your browser and nothing is sent anywhere.